Sub-Project Description (SPDT)

Sub-Project Description (SPDT) records descriptive information about each unique sub-project and phase combination.

A line is added to this table when a new project, sub-project and phase is accepted by the financial system via the Project Management Master (PJ) document. The additional descriptive information is entered maintained by the user.

  •  
  •  

Agency

Required. Enter a valid code from Agency Index (AGCY).

Project

Required. Enter the number assigned to uniquely identify the project through the Project Management Master (PJ) document is displayed.

Sub-Project

Required. Enter the code identifying a certain portion of the project assigned through the Project Management Master (PJ) document is displayed.

Phase

Required. Enter a pre-defined subdivision of a project assigned through the Project Management Master (PJ) document is displayed.

Organization

Optional. Enter the organization code for the sub-project and phase. If entered, the agency/organization combination must exist on Organization (ORG2).

Description

Optional. Enter a description of the sub-project and phase.

Status

A status of O - Open is displayed for open projects. A status of C - Closed is displayed for closed projects.

Work Description

Optional. Enter the type of work being accomplished.

Sponsor

Optional. Enter a description of the sponsor for the sub-project or phase.

Sponsor Code

Display only. The sponsor code from the Project Participation (PZ) transaction is displayed.

Benefit Agency

Optional. Enter a valid agency code fro Agency Index (AGCY).

Resp Participant

Optional. Enter the participant who is responsible for this sub-project/phase.

General Project View.

  •  
  •  

Budget Item

Optional. Enter the budgeted authority number of a construction program item identified in the five-year program.

County

Optional. Enter the county location of the sub-project and phase.

Entity

Optional. Enter the engineering district for the sub-project and phase.

Project Type

Optional. Enter the type of activity the project represents (e.g., new construction, major maintenance, etc.).

Est Project Cost

Optional. Enter the sub-project/phase's estimated cost.

Project Address

Optional. Enter the project's address.

Capitalizable

Optional. Enter whether the cost of this sub-project/phase should be capitalized.

File No

Optional. Enter a reference to file of paper documentation applicable to this sub-project/phase.

Building Number

Optional. Enter the number assigned by the Fixed Asset Subsystem. It identifies the general location and specific building.

Program Category

Optional. Enter the major program/provider and funding category for the sub-project and phase.

Board Entity

Optional. Enter the board district of the project, sub-project and phase.

Indian Reservation

Optional. Enter the code designating that the sub-project and phase is located on an Indian reservation.

Plan and Mgmt View

  •  
  •  

Manager

Optional. Enter the name of the person managing the sub-project and phase.

Parcel Number

Optional. Enter the code identifying individual parcels or plots of land. The number is assigned by row.

Plan Start Date

Optional. Enter the planned start date for this sub-project/phase.

Act Start Date

Optional. Enter the actual start date of this sub-project/phase.

Plan End Date

Optional. Enter the planned end date of this sub-project/phase.

Act End Date

Optional. Enter the actual end date of this sub-project/phase.

Gen Cont No

Optional. Enter the general contractor's Vendor Number. Must exist on Vendor (VEN2).

Arch Eng No

Optional. Enter the architectural/engineering firm's Vendor Number. Must exist on Vendor (VEN2).

Gen Cont Name and Address

Optional. Enter the general contractor's address. Should match the address on the corresponding entry on Vendor (VEN2).

Arch Eng Name and Address

Optional. Enter the architectural/engineering firm's address. Should match the address on the corresponding entry on Vendor (VEN2).

Road Project View.

  •  
  •  

RS Prefix

Optional. Enter the rural secondary project prefix.

RS Item No

Optional. Enter the rural secondary project item number.

Route

Optional. Enter the route number for this project, sub-project and phase. The code is entered through the Project Management Master (PJ) document, but can be changed or updated by the user here.

Mile Post

Optional. Enter the mile post of the sub-project and phase.

System

Optional. Enter the type of highway system (e.g., inter-state, urban, etc.

Project Length

Optional. Enter the length of road for this sub-project and phase.

Station

Optional. Enter the engineering station number for the sub-project and phase.

Area

Optional. Enter the engineering area for the sub-project and phase.

Fed Approp No

Optional. Enter the number of the Federal appropriation providing part or all of the project's funding.

Secondary Roads Plan

Optional. Enter the code that indicates that the project is administered by the state under the provisions of the secondary roads plan.

Fed Prefix/Route/Section

Optional. Enter the applicable Federal prefix, route and section if a FHWA-funded project. For other projects, this field may be used at the agency's discretion.